Bedini RPX Sideband Generator

* NEW * BEDINI RPX BOOK & DVD SET: BEDINI RPX


PRE-REGISTER - 19 SEATS LEFT!!!*** 2017 ENERGY CONFERENCE ***

Results 1 to 6 of 6

Thread: Tesla Chargers unavailable now - Can we build one?

  1. #1

    Tesla Chargers unavailable now - Can we build one?

    Solavei
    Hi all,

    As most anyone reading knows, the late John and Gary Bedini's company Energenx has closed. (RIP John and Gary)
    As such, their handmade chargers are no longer being manufactured. The Tesla Chargers company says that they are working on possibly bringing new chargers back again... someday.

    Let me preface this by saying that I am not trying to steal any proprietary technology or anything like that. I would buy one or more of their chargers if I could. I've built several SG type circuits, capacitory pulsing circuits, etc. While these work to rejuvenate and charge batteries just fine, it isn't practical to do on an ongoing basis. Simply because these simple circuits require close babysitting to make sure we don't overcharge the batteries, etc.

    What I'm trying to figure out is how can I build a circuit that can cap pulse my batteries, but also be smart enough to stop once the battery is fully charged? I know of several types of circuits that could be used, and some people have done this with fleeting success from what I've seen. Does anyone familiar with these Tesla chargers know some basic info that might help us experimenters build something like this? I don't expect to be able to build something as smart as say their 2.5A12 Extreme charger that is able to continue charging after the voltage reaches 15.3.. somehow knowing the battery needs more. I'm looking for just a simple voltage cutoff of some kind. This will be for personal use until I can, hopefully, one day buy the real thing.

    Thank you in advance. If I am in fact overstepping my bounds here, I will humbly retract my question as I don't want to become another Rick Friedrich! ack!

    Regards,
    Chris

  2. #2
    Networking Architect Aaron Murakami's Avatar
    Join Date
    Jul 2012
    Location
    Spokane, Washington
    Posts
    1,075
    Blog Entries
    1
    Hi Chris,

    We’ve actually got the 2.5a12-ex schematics and pcb files ready for production. We expect to start taking pre-orders in about 3 weeks and expect to be shipping in 6 weeks. From then on, we plan to have inventory to be able to offer same day or next day shipping so stay tuned!

    You’re definitely not overstepping any bounds – say what you want! Lol – I’d be wondering too.

    RPX units were the first items we wanted back in production – now the 2.5a12-ex is next. Please understand I’m brand new to manufacturing but now I think I have the processes down to a very specific methodology - at least according to how I worked it out - so each product after will be coming out faster and faster.
    Aaron Murakami





    You never change things by fighting the existing reality. To change something, build a new model that makes the existing model obsolete. ― Richard Buckminster Fuller

  3. #3
    Senior Member Faraday88's Avatar
    Join Date
    Sep 2012
    Location
    Bangaluru, Karnataka, India
    Posts
    1,032
    Quote Originally Posted by Aaron Murakami View Post
    Hi Chris,

    Weve actually got the 2.5a12-ex schematics and pcb files ready for production. We expect to start taking pre-orders in about 3 weeks and expect to be shipping in 6 weeks. From then on, we plan to have inventory to be able to offer same day or next day shipping so stay tuned!

    Youre definitely not overstepping any bounds say what you want! Lol Id be wondering too.

    RPX units were the first items we wanted back in production now the 2.5a12-ex is next. Please understand Im brand new to manufacturing but now I think I have the processes down to a very specific methodology - at least according to how I worked it out - so each product after will be coming out faster and faster.
    Hi Aaron,
    That sounds Great!!!!what about the products that you said John wanted to have it in the next line of Charger Technology..Solar Controller..ect..?
    Rgds,
    Faraday88.
    'If Real Education be Imparted...Paradigm Shift would become Redundant'

  4. #4

    Smile

    Quote Originally Posted by Aaron Murakami View Post
    Hi Chris,

    Weve actually got the 2.5a12-ex schematics and pcb files ready for production. We expect to start taking pre-orders in about 3 weeks and expect to be shipping in 6 weeks. From then on, we plan to have inventory to be able to offer same day or next day shipping so stay tuned!

    Youre definitely not overstepping any bounds say what you want! Lol Id be wondering too.

    RPX units were the first items we wanted back in production now the 2.5a12-ex is next. Please understand Im brand new to manufacturing but now I think I have the processes down to a very specific methodology - at least according to how I worked it out - so each product after will be coming out faster and faster.
    Awesome! This is great news Aaron! Let me know if you need any testers

    If anyone can figure out an efficient manufacturing plan, it's you man.

    Thanks!!
    Chris

  5. #5
    Networking Architect Aaron Murakami's Avatar
    Join Date
    Jul 2012
    Location
    Spokane, Washington
    Posts
    1,075
    Blog Entries
    1
    Quote Originally Posted by Faraday88 View Post
    Hi Aaron,
    That sounds Great!!!!what about the products that you said John wanted to have it in the next line of Charger Technology..Solar Controller..ect..?
    Rgds,
    Faraday88.
    Hi Faraday, that is for the 50 watt solar charge controller. That will be sometime after the 2.5A12-EX.
    Aaron Murakami





    You never change things by fighting the existing reality. To change something, build a new model that makes the existing model obsolete. ― Richard Buckminster Fuller

  6. #6
    Senior Member Faraday88's Avatar
    Join Date
    Sep 2012
    Location
    Bangaluru, Karnataka, India
    Posts
    1,032
    Solavei
    Quote Originally Posted by Aaron Murakami View Post
    Hi Faraday, that is for the 50 watt solar charge controller. That will be sometime after the 2.5A12-EX.
    Great News Aaron,Thumbs up!!!.. I too can offer my support for Testing/ Assembly ect...
    let me know for any help.

    Rgds,
    Faraday88.
    'If Real Education be Imparted...Paradigm Shift would become Redundant'

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •